Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk management system for pylon Construction of a Long Span Cable-Stayed Bridge
Risk management system for pylon Construction of a Long Span Cable-Stayed Bridge
Risk management system for pylon Construction of a Long Span Cable-Stayed Bridge
Chen, A. (Autor:in) / Ruan, X. (Autor:in) / Ouyang, X. (Autor:in) / Zhang, J. (Autor:in) / International Association for Bridge and Structural Engineering
IABSE symposium; Improving infrastructure worldwide: report ; 2007 ; Weimar, Germany
01.01.2007
2 pages
Includes 1 CD-ROM attached to inside back cover. Includes bibliographical references.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Europäisches Patentamt | 2021
|Dynamic Responses of Long-Span Steel Truss Girder Cable-Stayed Bridge With a Single Pylon
DOAJ | 2025
|Super-long-span cable-stayed bridge and construction method
Europäisches Patentamt | 2024
|Construction Control Technique of Long-Span Cable-Stayed Bridge
British Library Conference Proceedings | 2004
|Trans Tech Publications | 2011
|