Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
GCP-276 COST EFFECTIVE ALTERNATIVE BRIDGE REPLACEMENT IN ONTARIO
GCP-276 COST EFFECTIVE ALTERNATIVE BRIDGE REPLACEMENT IN ONTARIO
GCP-276 COST EFFECTIVE ALTERNATIVE BRIDGE REPLACEMENT IN ONTARIO
Proctor, P. (Autor:in) / Ropret, M. (Autor:in) / Schwendinger, G. (Autor:in) / Canadian Society for Civil Engineering
Annual Conference; 31st, Canadian Society for Civil Engineering ; 2003 ; Moncton, Canada
01.01.2003
133 pages
Held on CD-ROM. Abstracts in print form; Copy of CD-ROM held in Conference Index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cost-Effective Alternative for "Short Bridge" Replacement
British Library Conference Proceedings | 1994
|Alternative and Cost-Effective Bridge Approach Slabs
NTIS | 2010
|Mitigating Risk to Renew Infrastructure - Municipal Bridge Replacement in Ontario
British Library Conference Proceedings | 2007
|Bridge Replacement Cost Analysis Procedures
British Library Online Contents | 1995
|Bearing Repair Services Offer a Cost-Effective Alternative to Expensive Replacement
Online Contents | 2009