Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fuzzy Approach to Optimum Response Selection in Construction Project Risks
Fuzzy Approach to Optimum Response Selection in Construction Project Risks
Fuzzy Approach to Optimum Response Selection in Construction Project Risks
Farnad, N. (Autor:in) / Abbas, A. (Autor:in) / Mostafa, K. (Autor:in) / Wang, Y. / Sun, M. / Shen, Q.
International conference on construction and real estate management ; 2007 ; Bristol
01.01.2007
6 pages
Includes bibliographical references
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Probability Assessment of Project Risks Using Fuzzy-fault Tree Approach
British Library Conference Proceedings | 2003
|Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach
British Library Online Contents | 2012
|Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach
Online Contents | 2012
|Hybrid fuzzy MADM project-selection model for diversified construction companies
British Library Online Contents | 2010
|HSE risks assessment in urban high-rise construction using Fuzzy Approach
DOAJ | 2015
|