Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stress-Strain Analysis of Different Concrete Cut off Wall Connection Systems Case Study: Karkheh Storage Dam
Stress-Strain Analysis of Different Concrete Cut off Wall Connection Systems Case Study: Karkheh Storage Dam
Stress-Strain Analysis of Different Concrete Cut off Wall Connection Systems Case Study: Karkheh Storage Dam
Zoorasna, Z. (Autor:in) / Hamidi, A. (Autor:in) / Ghanbari, A. (Autor:in) / Mitchell, J.K. / Prakash, S. / Missouri University of Science and Technology
International Conference; August 11-16, 2008, Arlington, Virginia; 6th, Case histories in geotechnical engineering ; 2008 ; Arlington, VA
01.01.2008
2.90
Held in e-store (RMS)
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Seepage Through Different Concrete Cut Off Wall Connection Systems Case Study: Karkheh Storage Dam
British Library Conference Proceedings | 2008
|Plastic Concrete Specification A Case Study-Karkheh Dam Project
British Library Conference Proceedings | 2001
|Karkheh Storage Dam Cutoff Wall Analysis and Design 2.71
British Library Conference Proceedings | 2004
|Downstream Reaches Using the CCHE2D Software (Case Study the Karkheh Dam)
DOAJ | 2017
|HYDROPOWER & DAM ENGINEERING IN IRAN - The world's largest cutoff wall at Karkheh dam
Online Contents | 2005
|