Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gotthard Base Tunnel: Work progress at the five construction sections
Gotthard Base Tunnel: Work progress at the five construction sections
Gotthard Base Tunnel: Work progress at the five construction sections
Rehbock-Sander, M. (Autor:in) / Gerdes, A. (Autor:in) / Bartak, J.
33rd, World tunnel congress; Underground space; the 4th dimension of metropolises ; 2007 ; Prague
01.01.2007
6 pages
Also held on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The Gotthard Base Tunnel: Construction Work is progressing in 4 Part-sections
British Library Online Contents | 2000
Gotthard Base Tunnel: Progress and Planning
British Library Online Contents | 2003
|Gotthard Base Tunnel: Stage of Planning and Construction Work
British Library Online Contents | 2001
Gotthard Base Tunnel: Level of Planning and Construction work
British Library Online Contents | 1996
|Gotthard Base Tunnel: Special Aspects and Progress
British Library Online Contents | 2002