Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pump station and forcemain design optimisation in a fast-track design-build project
Pump station and forcemain design optimisation in a fast-track design-build project
Pump station and forcemain design optimisation in a fast-track design-build project
Eftekharzadeh, S. (Autor:in) / Riley, M. (Autor:in) / Mori, R. (Autor:in) / Rhodes, I.
4th, International conference on water and wastewater pumping station design ; 2008 ; Cranfield
01.01.2008
12 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Ugh, Not Another Forcemain High Point
TIBKAT | 2020
|Fast track design build of concrete viaduct
British Library Conference Proceedings | 2008
|Fast Track Project Implementation Through a Design/Build Contract at E-470
British Library Conference Proceedings | 1997
|Proven Practices in Design-Build and Fast-Track
ASCE | 2003
|Design-Build Tunneling Project in Urban Setting with Fast-track Engineering and Ground Modifications
British Library Conference Proceedings | 2013
|