Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Drilled Shafts for the Upper Northwest Interceptor, Sections 1&2 Project-Sacramento, CA
Construction of Drilled Shafts for the Upper Northwest Interceptor, Sections 1&2 Project-Sacramento, CA
Construction of Drilled Shafts for the Upper Northwest Interceptor, Sections 1&2 Project-Sacramento, CA
Theys, J. (Autor:in) / Schafer, C. (Autor:in) / Almeraris, G. / Mariucci, B. / Society for Mining, Metallurgy, and Exploration (U.S.)
19th, Rapid excavation and tunneling conference ; 2009 ; Las Vegas, NV
01.01.2009
14 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|British Library Conference Proceedings | 2007
|Microtunneling on the Lower Northwest Interceptor, Sacramento, California
British Library Conference Proceedings | 2006
|Sacramento County Northwest Interceptor: Effective Planning Ensures Project Success and Saves Money
British Library Conference Proceedings | 1998
|Surge Control Strategies for the Sacramento Lower Northwest Interceptor
British Library Conference Proceedings | 2006
|