Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Onsite Assembly and Hard Rock Tunneling at the Jinping-II Hydropower Station Power Tunnel Project
Onsite Assembly and Hard Rock Tunneling at the Jinping-II Hydropower Station Power Tunnel Project
Onsite Assembly and Hard Rock Tunneling at the Jinping-II Hydropower Station Power Tunnel Project
Smading, S.M. (Autor:in) / Roby, J. (Autor:in) / Willis, D. (Autor:in) / Almeraris, G. / Mariucci, B. / Society for Mining, Metallurgy, and Exploration (U.S.)
19th, Rapid excavation and tunneling conference ; 2009 ; Las Vegas, NV
01.01.2009
13 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Stability Analysis of Diversion Tunnels in Jinping II Hydropower Station Project
British Library Online Contents | 2008
|Jinping hydropower project: main technical issues on engineering geology and rock mechanics
Online Contents | 2010
|Regional tectonic stability at the Jinping hydropower station
British Library Conference Proceedings | 1994
|Jinping hydropower project: main technical issues on engineering geology and rock mechanics
Online Contents | 2010
|Engineering rock mechanics practices in the underground powerhouse at Jinping I hydropower station
DOAJ | 2016
|