Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
Jung, Y. (Autor:in) / Lee, Y.H. (Autor:in) / Woo, S. (Autor:in) / Yang, J.-S. (Autor:in) / An, S.-M. (Autor:in) / Oh, Y.-S. (Autor:in) / Lee, B.N. (Autor:in) / Ariaratnam, S.T. / Rojas, E.M. / Construction Institute; University of Washington
Construction Research Congress; Building a sustainable future ; 2009 ; Seattle, Wash
01.01.2009
10 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 1998
|Project schedule compression: a multi-objective methodology
Online Contents | 2013
|Project schedule compression: a multi-objective methodology
British Library Online Contents | 2013
|Project schedule compression: a multi-objective methodology
Emerald Group Publishing | 2013
|