Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction Work on Lyttelton Port of Christchurch, New Zealand, Marine Oil and Gas Terminal Utilising an Innovative Cable Stayed Fender System
Reconstruction Work on Lyttelton Port of Christchurch, New Zealand, Marine Oil and Gas Terminal Utilising an Innovative Cable Stayed Fender System
Reconstruction Work on Lyttelton Port of Christchurch, New Zealand, Marine Oil and Gas Terminal Utilising an Innovative Cable Stayed Fender System
Chalmers, G. (Autor:in) / McLennan, N. (Autor:in) / Davies, J. (Autor:in) / Ward, T. / Ostbo, B.I. / American Society of Civil Engineers
Triannual International Conference; 12th, Ports 2010 ; 2010 ; Jacksonville, FL
01.01.2010
10 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1986
|Innovative cable-stayed bridge
British Library Online Contents | 1998