Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation of Caisson breakwater at Costa Azul, Mexico
Installation of Caisson breakwater at Costa Azul, Mexico
Installation of Caisson breakwater at Costa Azul, Mexico
Hibbs, W. (Autor:in) / Bowers, P. (Autor:in) / Young, M. (Autor:in) / Dingwall, J. (Autor:in) / Allsop, N.W.H. / Institution of Civil Engineers (Great Britain)
Conference; 9th, Coasts, marine structures and breakwaters : adapting to change; proceedings of the 9th international conference organised by the Institution of Civil Engineers conference organised by the Institution of Civil Engineers ; 2009 ; Edinburgh
01.01.2010
12 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
CAISSON STRUCTURE INSTALLATION METHOD THERE OF AND BREAKWATER
Europäisches Patentamt | 2018
CAISSON STRUCTURE INSTALLATION METHOD THERE OF AND BREAKWATER
Europäisches Patentamt | 2017
|