Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost and Schedule Contingency for Large Underground Projects: What the Owner Needs to Know
Cost and Schedule Contingency for Large Underground Projects: What the Owner Needs to Know
Cost and Schedule Contingency for Large Underground Projects: What the Owner Needs to Know
Laughton, C. (Autor:in) / Eckert, L.R.
North American tunneling conference ; 2010 ; Portland, OR
01.01.2010
8 pages
Includes bibliographical references and index; Also known as NAT 2010
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Schedule contingency analysis for transit projects using a simulation approach
BASE | 2013
|Schedule contingency analysis for transit projects using a simulation approach
DOAJ | 2013
|Schedule contingency analysis for transit projects using a simulation approach
BASE | 2013
|Who Needs to Know What? Institutional Knowledge and Global Projects
Online Contents | 2010
|Who Needs to Know What? Institutional Knowledge and Global Projects
British Library Online Contents | 2010
|