Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integrated geometry control system for cable stayed bridge: Application to Incheon bridge
Integrated geometry control system for cable stayed bridge: Application to Incheon bridge
Integrated geometry control system for cable stayed bridge: Application to Incheon bridge
Shin, H.Y. (Autor:in) / Im, D.K. (Autor:in) / Yoo, J.K. (Autor:in) / Kim, C.H. (Autor:in) / Frangopol, D.M. / Sause, R. / Kusko, C.S. / International Association for Bridge Maintenance and Safety
5th, International conference on bridge maintenance, safety and management ; 2010 ; Philadelphia, PA
01.01.2010
365 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction and Geometry Control of Incheon Cable-Stayed Bridge
British Library Online Contents | 2012
|Construction and Geometry Control of Incheon Cable-Stayed Bridge
Online Contents | 2012
|Geometry control for the concrete pylon of Incheon Cable Stayed Bridge
British Library Conference Proceedings | 2008
|British Library Conference Proceedings | 2008
|Geometry Control of Cable Stayed Bridge in Seohae Bridge
British Library Conference Proceedings | 2001
|