Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Probabilistic cost model for bridge integrated project delivery and management
Probabilistic cost model for bridge integrated project delivery and management
Probabilistic cost model for bridge integrated project delivery and management
Huang, M.G. (Autor:in) / Kim, B.G. (Autor:in) / Lee, S.H. (Autor:in) / Park, Y.H. (Autor:in) / Koh, H.-M. / Frangopol, D.M.
4th, International Conference on Bridge Maintenance, Safety and Management ; 2008 ; Seoul, Korea
01.01.2008
434 pages
Revised conference papers; Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Factors driving success of cost management practices in Integrated Project Delivery (IPD)
BASE | 2020
|Factors Driving Success of Cost Management Practices in Integrated Project Delivery (IPD)
DOAJ | 2020
|Probabilistic-based bridge management implemented at Skovdiget West Bridge
British Library Conference Proceedings | 2000
|Energy-Related Risk Management in Integrated Project Delivery
Online Contents | 2013
|Energy-Related Risk Management in Integrated Project Delivery
British Library Online Contents | 2013
|