Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The innovative construction method for the long-span suspension bridge connecting Myodo and Gwangyang in Korea
The innovative construction method for the long-span suspension bridge connecting Myodo and Gwangyang in Korea
The innovative construction method for the long-span suspension bridge connecting Myodo and Gwangyang in Korea
Shin, S.-H. (Autor:in) / Yu, P.-J. (Autor:in) / Jeong, S.-W. (Autor:in) / Takizawa, Y. (Autor:in) / Koh, H.-M. / Frangopol, D.M.
4th, International Conference on Bridge Maintenance, Safety and Management ; 2008 ; Seoul, Korea
01.01.2008
461 pages
Revised conference papers; Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The planning and design of the long-span suspension bridge connecting Myodo and Gwangyang in Korea
British Library Conference Proceedings | 2008
|The Planning and Design of Gwangyang Suspension Bridge with Epoxy Asphalt in Korea
British Library Conference Proceedings | 2008
|IDC for economical and safe design for the suspension bridge connecting Myodo and Gwangyang
British Library Conference Proceedings | 2008
|Gwangyang Bridge - Numerical Simulation of Construction Sequence
British Library Conference Proceedings | 2010
|Gwangyang: Launches third-stage project for Gwangyang Port
British Library Online Contents | 2002