Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vibration control of cable-stayed bridge and derrick crane system during construction
Vibration control of cable-stayed bridge and derrick crane system during construction
Vibration control of cable-stayed bridge and derrick crane system during construction
Pae, H.-J. (Autor:in) / Kim, D.-S. (Autor:in) / Park, W. (Autor:in) / Park, K.-S. (Autor:in) / Koh, H.-M. (Autor:in) / Koh, H.-M. / Frangopol, D.M.
4th, International Conference on Bridge Maintenance, Safety and Management ; 2008 ; Seoul, Korea
01.01.2008
4 pages
Revised conference papers; Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction
Online Contents | 2009
|Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction
British Library Online Contents | 2009
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Vibration reduction auxiliary cable device for cable-stayed bridge and cable-stayed bridge
Europäisches Patentamt | 2023
|