Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Efficiency of Pile Groups of Large Diameter Bored Cast-in-Place Pile
Efficiency of Pile Groups of Large Diameter Bored Cast-in-Place Pile
Efficiency of Pile Groups of Large Diameter Bored Cast-in-Place Pile
Gong, X.B. (Autor:in) / Fan, Q.L. (Autor:in) / Xu, Y.J. (Autor:in) / Zhao, Jingying
conference, Advances in building materials ; 2011 ; Kunming, China
Advances in building materials ; 1215-1219
ADVANCED MATERIALS RESEARCH -ZUG- ; 261-263
01.01.2011
5 pages
Includes bibliographical references and indexes.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Efficiency of Pile Groups of Large Diameter Bored Cast-in-Place Pile
Trans Tech Publications | 2011
|Response of Laterally Loaded Large-Diameter Bored Pile Groups
British Library Online Contents | 2001
|Response of Laterally Loaded Large-Diameter Bored Pile Groups
Online Contents | 2001
|Construction method for pile head of bored cast-in-place pile
Europäisches Patentamt | 2023
|Large-diameter cast-in-situ bored pile and construction method thereof
Europäisches Patentamt | 2020
|