Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and Construction of Seismic Remediation for Duke Energy's Catawba Dam
Design and Construction of Seismic Remediation for Duke Energy's Catawba Dam
Design and Construction of Seismic Remediation for Duke Energy's Catawba Dam
Chrisman, B.F. (Autor:in) / Keaton, B.T. (Autor:in) / Association of State Dam Safety Officials
Conference, Association of State Dam Safety Officials ; 2010 ; Seattle, WA
01.01.2010
12 pages
Includes bibliographical references and author index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Seismic Remediation of Duke Energy's Lake James Embankment Dams
British Library Conference Proceedings | 2009
|Reviewing Duke Energy's Dam Stability, Flood, and Seismic Remediation Programs
British Library Online Contents | 2006
|Aerating Turbines for Duke Energy's New Bridgewater Powerhouse
Online Contents | 2010
|Aerating Turbines for Duke Energy's New Bridgewater Powerhouse
British Library Online Contents | 2010
|Discussion of “Hageman on Re-Design of Catawba Station”
ASCE | 2021
|