Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wienerwald Tunnel-A Challenging Infrastructure Project with Two 11-km-Long TBM Drives
Wienerwald Tunnel-A Challenging Infrastructure Project with Two 11-km-Long TBM Drives
Wienerwald Tunnel-A Challenging Infrastructure Project with Two 11-km-Long TBM Drives
Rapid excavation and tunneling conference ; 2011 ; San Francisco, CA
01.01.2011
9 pages
Includes bibliographical references and index; Also known as RETC 2011. Same papers on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Operations research aspects of TBM drives - Case study of Wienerwald-Tunnel
British Library Conference Proceedings | 1996
|TBM Wienerwald Tunnel - Steps towards successful tunnelling
Tema Archiv | 2008
|Breakthrough at the Wienerwald Tunnel/A
British Library Online Contents | 2007
|Wienerwald tunnel - geological exploration for planning and construction
IuD Bahn | 2000
|Divisible Formwork for the Wienerwald Tunnel/A
British Library Online Contents | 2006