Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
O1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati
O1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati
O1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati
Lamb, S. (Autor:in) / Abernathy, S. (Autor:in) / Redmond, S. / Romero, V. / Society for Mining, Metallurgy, and Exploration (U.S.)
Rapid excavation and tunneling conference ; 2011 ; San Francisco, CA
01.01.2011
7 pages
Includes bibliographical references and index; Also known as RETC 2011. Same papers on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Engineering Index Backfile | 1936
Sewer tunnels in Singapore prove tough testing ground
British Library Online Contents | 2004
|Initiating Sewer System Real Time Controls in Cincinnati
British Library Conference Proceedings | 2006
|Sewer Tunnels Under Surface Obstacles
Online Contents | 1993
|Face Stability Analysis of Slurry Shield Tunnels in Rock-Soil Interface Mixed Ground
Springer Verlag | 2021
|