Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station
Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station
Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station
Yu, Y.S. (Autor:in) / Qian, P.H. (Autor:in) / Zhang, S.F. (Autor:in) / Sun, D. / Sung, W.-P. / Chen, R.
Conference, Frontiers of green building, materials and civil engineering; (GBMCE 2011) ; 2011 ; Shangri-La, China
01.01.2011
5 pages
International conference proceedings; Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Trans Tech Publications | 2011
|Rock Cofferdams Demolition Blasting at Tailrace Tunnel of Hydropower Station
British Library Conference Proceedings | 2002
|New design of tailrace conduits of hydropower plants
Online Contents | 1985
|New design of tailrace conduits of hydropower plants
Springer Verlag | 1985
|