Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Research on Formation Mechanism of Deep Cracks in Left Bank Slope of Jinping First Stage Hydropower Station Based on DDA Method
Research on Formation Mechanism of Deep Cracks in Left Bank Slope of Jinping First Stage Hydropower Station Based on DDA Method
Research on Formation Mechanism of Deep Cracks in Left Bank Slope of Jinping First Stage Hydropower Station Based on DDA Method
International conference; 2nd, Civil engineering, architecture and building materials CEABM 2012 ; 2012 ; Yantai, China
01.01.2012
5 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
Online Contents | 2004
|Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
British Library Online Contents | 2004
|Trans Tech Publications | 2012
|Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station
DOAJ | 2016
|