Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost Estimation Method of Post-Earthquake Rehabilitation of Power System
Cost Estimation Method of Post-Earthquake Rehabilitation of Power System
Cost Estimation Method of Post-Earthquake Rehabilitation of Power System
Wang, Y.R. (Autor:in) / Dai, J.W. (Autor:in) / Zhang, M.Y. (Autor:in) / Du, Xiuli
International conference; 2nd, Structures and building materials ; 2012 ; Hangzhou, China
Structures and building materials ; 3083-3086
ADVANCED MATERIALS RESEARCH -ZUG- ; 446/449
01.01.2012
4 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Post-Earthquake Rehabilitation of Damaged RC Frames
British Library Conference Proceedings | 1996
|British Library Conference Proceedings | 2014
|Post Earthquake Reconstruction and Rehabilitation in Jabalpur
British Library Conference Proceedings | 1998
|