Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The New Lake Townsend Dam - Design Constraints and Construction Challenges
The New Lake Townsend Dam - Design Constraints and Construction Challenges
The New Lake Townsend Dam - Design Constraints and Construction Challenges
Cannon, R. (Autor:in) / Marshall, H.T. (Autor:in) / Robblee, G. (Autor:in) / Snider, F. (Autor:in) / Williams, A. (Autor:in) / Rutledge, F.A. (Autor:in) / King, M. (Autor:in) / Association of State Dam Safety Officials
Annual Conference, Association of State Dam Safety Officials ; 2012 ; Denver, CO
01.01.2013
19 pages
Includes bibliographical references and author index
Aufsatz (Konferenz)
Englisch
Dam safety , Safety , ASDSO
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The Reincarnation of Lake Townsend Dam
British Library Online Contents | 2013
|The Reincarnation of Lake Townsend Dam
ASCE | 2016
|Concrete Cancer at Lake Townsend Dam an ASR Tale
British Library Conference Proceedings | 2007
|The Hydraulic Design Toolbox: Theory and Modeling for the Lake Townsend Spillway Replacement Project
British Library Conference Proceedings | 2008
|DataCite | 1906
|