Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
100-foot deep Utility Tunnel - Port of Miami
100-foot deep Utility Tunnel - Port of Miami
100-foot deep Utility Tunnel - Port of Miami
Joykutty, S. (Autor:in) / Vega, E.A. (Autor:in) / Fernandez-Cuervo, V. (Autor:in) / Carney, P.A. (Autor:in) / Alonso, M.P. (Autor:in) / Fitzgerald, S.W. (Autor:in) / Water Environment Federation
Annual conference; 85th, Water Environment Federation; WEFTEC 2012 ; 2012 ; New Orleans, LA
01.01.2012
479 pages
Held in e-store (RMS)
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
PORT OF MIAMI TUNNEL - Moving forward in Miami
Online Contents | 2012
Ground Investigation Challenges at the Port of Miami Tunnel Project, Miami, Florida
British Library Conference Proceedings | 2013
|Port of Miami Tunnel Study: Bored or Immersed Tubes?
British Library Conference Proceedings | 2005
|Heavy Truck Movement Model for the Port of Miami
British Library Conference Proceedings | 1998
|Adaptive Dredged Material Discharge for the Port of Miami
British Library Conference Proceedings | 1998
|