Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unprecedented EPB Excavation in Pressurized Mixed Ground Conditions: Study of Performance at the Emisor Oriente Wastewater Tunnel
Unprecedented EPB Excavation in Pressurized Mixed Ground Conditions: Study of Performance at the Emisor Oriente Wastewater Tunnel
Unprecedented EPB Excavation in Pressurized Mixed Ground Conditions: Study of Performance at the Emisor Oriente Wastewater Tunnel
conference; 21st, Rapid excavation and tunneling ; 2013 ; Washington, DC
01.01.2013
9 pages
Includes bibliographical references and index; Also known as RETC 2013
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
TUNNEL EMISOR ORIENTE - Mexico's mega dig
Online Contents | 2011
Tunel Emisor Oriente: Das weltgrößte Abwasserprojekt
Tema Archiv | 2012
|Tunel Emisor Oriente in Mexico, the World's Most Challenging EPB Shield Tunnelling Project
British Library Conference Proceedings | 2011
|British Library Conference Proceedings | 2017
|