Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brightwater Conveyance System, Central Contract: Overcoming the Challenges of Installing Pipe and Final Linings in Long Bore Tunnels
Brightwater Conveyance System, Central Contract: Overcoming the Challenges of Installing Pipe and Final Linings in Long Bore Tunnels
Brightwater Conveyance System, Central Contract: Overcoming the Challenges of Installing Pipe and Final Linings in Long Bore Tunnels
conference; 21st, Rapid excavation and tunneling ; 2013 ; Washington, DC
01.01.2013
9 pages
Includes bibliographical references and index; Also known as RETC 2013
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design of the Brightwater Conveyance Tunnels
British Library Conference Proceedings | 2005
|Jet Grout Ground Modifications for the Brightwater Conveyance System
British Library Conference Proceedings | 2008
|Exploration Decision Analyses for the Brightwater Tunnels
British Library Conference Proceedings | 2005
|British Library Online Contents | 2012
|The Degradation and Failure of Concrete Linings Around Water Conveyance Tunnels
Online Contents | 1994
|