Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dynamic Operation Control of Long-Term Scheduling for a Large-Scale Hydropower System
Dynamic Operation Control of Long-Term Scheduling for a Large-Scale Hydropower System
Dynamic Operation Control of Long-Term Scheduling for a Large-Scale Hydropower System
Cheng, X. (Autor:in) / Shen, J.-J. (Autor:in) / Wu, X.-Y. (Autor:in) / Cheng, C.-T. (Autor:in) / Patterson, C.L. / Murray, D.J. / American Society of Civil Engineers
Congress, World environmental and water resources; World environmental and water resources congress (EWRI 2013); showcasing the future : Cincinnati, Ohio, USA, 19-23 May 2013; editors, Craig L. Patterson, Daniel J. Murray Jr ; 2013 ; Cincinnati, OH
01.01.2013
9 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
DOAJ | 2018
|Short-Term Scheduling of Large-Scale Hydropower Systems for Energy Maximization
Online Contents | 2004
|Short-Term Scheduling of Large-Scale Hydropower Systems for Energy Maximization
British Library Online Contents | 2004
|Large-scale hydropower system optimization
British Library Conference Proceedings | 2001
|