Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tracing Study of Tributary Mouth Bar in Yellow-River Xiaolangdi Reservoir during Early Stage of Operation
Tracing Study of Tributary Mouth Bar in Yellow-River Xiaolangdi Reservoir during Early Stage of Operation
Tracing Study of Tributary Mouth Bar in Yellow-River Xiaolangdi Reservoir during Early Stage of Operation
Guo, X.Y. (Autor:in) / Guo, S.L. (Autor:in) / Zhao, Shunbo
International conference; 2nd, Civil engineering, architecture and sustainable infrastructure ; 2013 ; Zhengzhou , China
01.01.2013
4 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2012
|Numerical and Physical Modelings of the Xiaolangdi Reservoir on the Yellow River
British Library Conference Proceedings | 2004
|DOAJ | 2022
|Underground excavation in Xiaolangdi project in Yellow River
Tema Archiv | 2005
|Underground excavation in Xiaolangdi project in Yellow River
British Library Online Contents | 2004
|