Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
Huang, J.W. (Autor:in) / Pan, H.M. (Autor:in) / Li, Y. (Autor:in) / Zhu, Y.T. (Autor:in) / Liao, Z.Y. (Autor:in) / Abbas, Husain / Hwee, TAN Kiang
International conference; 4th, Structures and building materials ; 2014 ; Guangzhou, China
01.01.2014
4 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2019
|British Library Online Contents | 2019
|Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM)
BASE | 2021
|Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns
British Library Online Contents | 2014
|