Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintenance and Renewal of Concrete Rail Bridges - Results from EC Project MAINLINE
Maintenance and Renewal of Concrete Rail Bridges - Results from EC Project MAINLINE
Maintenance and Renewal of Concrete Rail Bridges - Results from EC Project MAINLINE
Nilimaa, J. (Autor:in) / Haggstrom, J. (Autor:in) / Bagge, N. (Autor:in) / Blanksvard, T. (Autor:in) / Sas, G. (Autor:in) / Ohlsson, U. (Autor:in) / Bernspang, L. (Autor:in) / Taljsten, B. (Autor:in) / Elfgren, L. (Autor:in) / Carolin, A. (Autor:in)
22nd, Nordic concrete research symposium; XXII Nordic concrete research symposia; Reykjavik, Iceland 2014 ; 2014 ; Reykjavik
01.01.2014
4 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Extended Life of Railway Bridges. Results from EC-FP7-Project Mainline
British Library Conference Proceedings | 2013
|Extend the life of existing railway bridges : Results from EU FP7 project MAINLINE
BASE | 2015
|TIBKAT | 2023
|Continuous rail turnouts favour mainline track
IuD Bahn | 2013
|RENEWAL OF THE WEST COAST MAINLINE ELECTRIFICATION INFRASTRUCTURE
British Library Conference Proceedings | 2002
|