Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Feng, C.W. (Autor:in) / Chen, Y.J. (Autor:in) / Huang, J.R. (Autor:in) / International Association for Automation and Robotics in Construction
International Symposium; 25th, Automation and robotics in construction ; 2008 ; Vilnius
01.01.2010
10 pages
Also known as ISARC-2008; ESTAR title
Aufsatz (Konferenz)
Englisch
Automation , Robotics , Construction , ISARC , IAARC
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Using the MD CAD model to develop the time cost integrated schedule for construction projects
British Library Online Contents | 2010
|Integrated cost and schedule control for construction projects
TIBKAT | 1986
|