Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station
Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station
Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station
Voorwinde, Michael (Autor:in) / Garavito-Bruhn, Eci (Autor:in) / Dalton, Liam (Autor:in) / Giffen, Richard (Autor:in)
Rapid excavation and tunneling ; 2015 ; New Orleans, LA
01.01.2015
11 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Concrete Operations at the 86th Street Station for the 2nd Avenue Subway Line
British Library Conference Proceedings | 2015
|Second Avenue Subway Project-History and Construction Challenges
British Library Conference Proceedings | 2004
|