Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and Implementation of a Large-Diameter, Dual-Mode ``Crossover'' TBM for the Akron Ohio Canal Interceptor Tunnel
Design and Implementation of a Large-Diameter, Dual-Mode ``Crossover'' TBM for the Akron Ohio Canal Interceptor Tunnel
Design and Implementation of a Large-Diameter, Dual-Mode ``Crossover'' TBM for the Akron Ohio Canal Interceptor Tunnel
Comis, E. (Autor:in) / Chastka, D. (Autor:in)
Rapid excavation and tunneling (Conference)
01.01.2017
10 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2019
|British Library Conference Proceedings | 2019
|Akron Art Museum Akron, Ohio, Stati Uniti
British Library Online Contents | 2007
|Quality Control of Secant Piles and Jet Grouting for the Ohio Canal Interceptor Tunnel
British Library Conference Proceedings | 2019
|