Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cutting New Ground: TBM Selection for Fort Wayne Utilities Tunnel Works Program
Cutting New Ground: TBM Selection for Fort Wayne Utilities Tunnel Works Program
Cutting New Ground: TBM Selection for Fort Wayne Utilities Tunnel Works Program
Short, T. J. (Autor:in) / Gentile, Leo (Autor:in) / Day, David (Autor:in)
Rapid excavation and tunneling (Conference)
01.01.2019
9 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The Fort Wayne lamp works of the electric company
Engineering Index Backfile | 1908
Fort Wayne builds modern carhouse
Engineering Index Backfile | 1924
Design of the Fort Wayne CSO Tunnel Through Complex/Wet Rock
British Library Conference Proceedings | 2017
|The New Fort Wayne Water Supply
Wiley | 1932
|Fort Wayne plans north-south and east-west expressways
Engineering Index Backfile | 1947