Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Keeping the faith: Salisbury Cathedral's famous 6m spire restoration project is complete, but raising the funds for less glamorous repair work was a major stumbling block to the 25-year renewal programme - until the introduction of English Heritage grants. Now, the cathedral's 45-strong craft team, keeping to traditional building methods, has been able to start on two of the cathedral's 19 main repair areas
Keeping the faith: Salisbury Cathedral's famous 6m spire restoration project is complete, but raising the funds for less glamorous repair work was a major stumbling block to the 25-year renewal programme - until the introduction of English Heritage grants. Now, the cathedral's 45-strong craft team, keeping to traditional building methods, has been able to start on two of the cathedral's 19 main repair areas
Keeping the faith: Salisbury Cathedral's famous 6m spire restoration project is complete, but raising the funds for less glamorous repair work was a major stumbling block to the 25-year renewal programme - until the introduction of English Heritage grants. Now, the cathedral's 45-strong craft team, keeping to traditional building methods, has been able to start on two of the cathedral's 19 main repair areas
01.01.1994
12 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Laser Cleaning Lincoln Cathedral's Romanesque Frieze
Taylor & Francis Verlag | 1998
|Detailed structural analysis of Mallorca Cathedral's structure on a global model
BASE | 2011
|British Library Online Contents | 2003
BASE | 2017
|