Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Managing the Installation of Augered Cast-In-Place Piles
Managing the Installation of Augered Cast-In-Place Piles
Managing the Installation of Augered Cast-In-Place Piles
Esrig, M. I. (Autor:in) / Leznicki, J. K. (Autor:in) / Gaibrois, R. G. (Autor:in)
01.01.1994
27 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
388
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Installation of Augered Cast-In-Place Piles
British Library Conference Proceedings | 1998
|British Library Conference Proceedings | 1988
|Installation of Augered CIP Piles
British Library Conference Proceedings | 1997
|An Overview of Augered, Cast-In-Place Piles in Florida
British Library Conference Proceedings | 1997
|