Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time Is Money: Innovative Contracting Methods in Highway Construction
Time Is Money: Innovative Contracting Methods in Highway Construction
Time Is Money: Innovative Contracting Methods in Highway Construction
Herbsman, Z. J. (Autor:in) / Wei Tong Chen (Autor:in) / Epstein, W. C. (Autor:in)
01.01.1995
273 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Time Is Money: Innovative Contracting Methods in Highway Construction
Online Contents | 1995
|Time Is Money: Innovative Contracting Methods in Highway Construction
Online Contents | 1997
|Time Is Money: Innovative Contracting Methods in Highway Construction: Closure
British Library Online Contents | 1997
|British Library Online Contents | 1997
|Contracting Methods for Highway Construction
British Library Online Contents | 1999