Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method
Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method
Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method
Liu, L. (Autor:in) / Burns, S. A. (Autor:in) / Feng, C.-W. (Autor:in)
01.01.1995
446 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction Time-Cost Trade-Off Analysis Using LP-IP Hybrid Method
Online Contents | 1995
|The LP-IP hybrid method for construction time-cost trade-off analysis
Online Contents | 1996
|The LP/IP hybrid method for construction time-cost trade-off analysis
British Library Online Contents | 1996
|The LP/IP hybrid method for construction time-cost trade-off analysis
Taylor & Francis Verlag | 1996
|Stochastic Construction Time-Cost Trade-Off Analysis
British Library Online Contents | 2000
|