Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Accessing Atlantic City: During construction, the project team for the $254 million Atlantic City Convention Center and accompanying rail terminal dealt with complex specifications, a constrained site and highly varied soils
Accessing Atlantic City: During construction, the project team for the $254 million Atlantic City Convention Center and accompanying rail terminal dealt with complex specifications, a constrained site and highly varied soils
Accessing Atlantic City: During construction, the project team for the $254 million Atlantic City Convention Center and accompanying rail terminal dealt with complex specifications, a constrained site and highly varied soils
Regenscheid, P. (Autor:in)
CIVIL ENGINEERING -NEW YORK- ; 66 ; 62-63
01.01.1996
2 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Online Contents | 1996
|The Atlantic City convention hall
Engineering Index Backfile | 1929
|The Atlantic City convention hall
Engineering Index Backfile | 1929
|Design and construction of the Atlantic City convention hall
Engineering Index Backfile | 1928
|Big Span, Big Fun: The Atlantic City Convention Hall
ASCE | 2020
|