Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Riddle of the Riverbed: A load-test program saved $4.5 million on the Salt River Bridge in Arizona, founded in a variably cemented clay layer deep beneath the riverbed
Riddle of the Riverbed: A load-test program saved $4.5 million on the Salt River Bridge in Arizona, founded in a variably cemented clay layer deep beneath the riverbed
Riddle of the Riverbed: A load-test program saved $4.5 million on the Salt River Bridge in Arizona, founded in a variably cemented clay layer deep beneath the riverbed
Walsh, K. D. (Autor:in) / Schock, R. E. (Autor:in) / Jimenez, S. A. (Autor:in)
CIVIL ENGINEERING -NEW YORK- ; 66 ; 64-67
01.01.1996
4 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Online Contents | 1996
|River channel local riverbed and river channel riverbed undercutting control method
Europäisches Patentamt | 2024
|UNIT BODY OF RIVERBED STRUCTURE AND RIVERBED STRUCTURE
Europäisches Patentamt | 2017
|Riverbed fixed distribution structure and riverbed fixed analysis method
Europäisches Patentamt | 2022
|Modified riverbed soil for filling and modified riverbed soil roadbed
Europäisches Patentamt | 2024
|