Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F. (Autor:in) / Olomolaiye, P. O. (Autor:in) / Holt, G. D. (Autor:in) / Harris, F. C. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 15 ; 83-94
01.01.1997
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Taylor & Francis Verlag | 1997
|Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Online Contents | 1997
|Factors influencing Time and Cost Overruns on Freeform Construction Projects
Online Contents | 2019
|Factors influencing Time and Cost Overruns on Freeform Construction Projects
Springer Verlag | 2019
|