Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mining of large station in Lohring successfully completed
Mining of large station in Lohring successfully completed
Mining of large station in Lohring successfully completed
Dietrich, J. (Autor:in) / Hoppe, P. (Autor:in) / Reikat, K.-H. (Autor:in) / Scholz, M. (Autor:in)
BAUINGENIEUR ; 72 ; 23-32
01.01.1997
10 pages
Aufsatz (Zeitschrift)
Deutsch
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Largest moving job successfully completed
Engineering Index Backfile | 1929
Complex bridge transfer successfully completed
Engineering Index Backfile | 1920
Largest moving job successfully completed
Engineering Index Backfile | 1929
Round-robin ``cement analysis'' test successfully completed
British Library Online Contents | 2018