Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The A39 motorway - 350,000 tonnes of cement-treated sand in three months
The A39 motorway - 350,000 tonnes of cement-treated sand in three months
The A39 motorway - 350,000 tonnes of cement-treated sand in three months
Bense, P. (Autor:in) / Hombert, M. (Autor:in)
TRAVAUX -PARIS- FRENCH EDITION- ; 24-28
01.01.1997
5 pages
Aufsatz (Zeitschrift)
Französisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The A39 motorway- 350,000 tonnes of cement-treated sand in three months
Online Contents | 1997
|A 350,000-volt testing transformer
Engineering Index Backfile | 1922
|Caballo dam on Rio Grande to store 350,000 ac ft
Engineering Index Backfile | 1936
Running a 45-million-tonnes cement production capacity
British Library Online Contents | 2006
Placing 350,000 cubic yards of concrete in ariel dam
Engineering Index Backfile | 1931
|