Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Scheduling/Cost Optimization and Neural Dynamics Model for Construction
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 123 ; 450-459
01.01.1997
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Scheduling-Cost Optimization and Neural Dynamics Model for Construction
Online Contents | 1997
|Developing an optimization financing cost-scheduling trade-off model in construction project
Taylor & Francis Verlag | 2022
|Time-cost optimization using hybrid evolutionary algorithm in construction project scheduling
Online Contents | 2009
|Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
British Library Online Contents | 2008
|Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
Online Contents | 2008
|