Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid Redecking: A contractor overcame tough lane closure restrictions and site accessibility problems to replace 7,000 m^2 of bridge deck one year early
Rapid Redecking: A contractor overcame tough lane closure restrictions and site accessibility problems to replace 7,000 m^2 of bridge deck one year early
Rapid Redecking: A contractor overcame tough lane closure restrictions and site accessibility problems to replace 7,000 m^2 of bridge deck one year early
Pickle, R. (Autor:in)
CIVIL ENGINEERING -NEW YORK- ; 68 ; 65-68
01.01.1998
4 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Metal Forms Replace Reinforcement in Bridge Deck Slabs
British Library Conference Proceedings | 2002
|Through the mill Birds, blows and a bridge: how a project overcame its problems
British Library Online Contents | 2002
Steady plugging overcame weather handicaps
Engineering Index Backfile | 1928
|Rapid closure method for deck type steel tube arch bridge arch ribs
Europäisches Patentamt | 2022
|