Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Operating results from the first 30 months with the new klin line 5 at the Ruedersdorf cement works
Operating results from the first 30 months with the new klin line 5 at the Ruedersdorf cement works
Operating results from the first 30 months with the new klin line 5 at the Ruedersdorf cement works
Kehl, P. (Autor:in) / Scharf, K.-F. (Autor:in) / Scur, P. (Autor:in) / Wirthwein, R. (Autor:in)
ZKG INTERNATIONAL ; 51 ; 410-427
01.01.1998
18 pages
Aufsatz (Zeitschrift)
Deutsch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Polysius roller mills for cement grinding - operating results from a Mexican cement works
British Library Online Contents | 2001
|Bonnybrook UV disinfection operating results: The first 18 months
British Library Conference Proceedings | 1995
|Klin rehabilitation in Tanzania
British Library Online Contents | 2014
|Operating performances: refurbishing ventilators in cement works
British Library Online Contents | 2010