Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slab solution for main line mine moves Solving a century-old subsidence problem on the East Coast Main Line
Slab solution for main line mine moves Solving a century-old subsidence problem on the East Coast Main Line
Slab solution for main line mine moves Solving a century-old subsidence problem on the East Coast Main Line
GROUND ENGINEERING ; 33 ; 18-20
01.01.2000
3 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
625
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958
Progress of east coast main line widening
Engineering Index Backfile | 1958
East Coast main line´s £ 3 million upgrade
IuD Bahn | 2002
|