Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Happy bridge building TennDOT rewarded for construction of longest jointless integral abutment concrete bridge
Happy bridge building TennDOT rewarded for construction of longest jointless integral abutment concrete bridge
Happy bridge building TennDOT rewarded for construction of longest jointless integral abutment concrete bridge
ROADS AND BRIDGES -DES PLAINES- ; 38 ; 78-79
01.01.2000
2 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Europäisches Patentamt | 2020
|New Technologies in China's First Jointless Integral-Abutment Bridge
British Library Conference Proceedings | 2004
|Theoretical Model and Mechanical Performance of Semi-Integral Abutment Jointless Bridge
Trans Tech Publications | 2013
|The Review about a New Type of Bridge Structure - Semi-Integral Abutment Jointless Bridge
British Library Conference Proceedings | 2012
|Investigation on Flooding-Resistant Performance of Integral Abutment and Jointless Bridge
DOAJ | 2020
|