Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Analysis of Water-Filling of Subsided Column Based on Time Section
Analysis of Water-Filling of Subsided Column Based on Time Section
Analysis of Water-Filling of Subsided Column Based on Time Section
Yang, S.-a. (Autor:in) / Zhang, S.-t. (Autor:in) / Guo, Y.-h. (Autor:in)
01.01.2001
3 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
622
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Stabilization of Subsided Hedoro in Irrigation Ponds
British Library Conference Proceedings | 1992
|Method for modifying concrete slab on subsided ground
Europäisches Patentamt | 2018
|Perspectives on non-filling reclamation techniques for subsided land in Chinese coal mining areas
British Library Conference Proceedings | 2003
|Method for modifying concrete slab on subsided ground
Europäisches Patentamt | 2023
|